The engineering problem was to move a large enterprise data workload without treating migration as a one-time copy. Schema conversion, controlled data movement, validation, and a coordinated cutover had to stay connected.
Treat data movement as a sequence of checks.
I contributed to analysis, schema-conversion work, compatibility and SQL validation, coordination, monitoring and testing, and cutover support within the Accenture team. The diagram keeps the public explanation at the verified workflow level rather than exposing a client architecture.
Inspectable workflow
Workflow walkthrough
Keep the source data and workload context visible before changing the migration path.
Verified team migration context · 1 TB+ and zero downtime remain Accenture-specificScope and evidence
Client identity, topology, instance configuration, duration, team size, cost, and performance detail remain confidential.